Before I measure a Colchester house for an addition I want to know where the septic tank and leach field are. Much of town isn't on sewer, and you can't build over a leach field or run a concrete truck across one. On a small lot the field, the well, the setbacks and the lake can leave exactly one place where an addition fits. Better to find that spot first and design to it.
The houses themselves come in two rough kinds. There are regular houses, the ranches and capes and colonials in the neighborhoods, which take an addition the way any house does. Then there are camps that became houses a piece at a time, and adding onto one of those means first deciding whether what's there can carry another piece.

What Colchester houses and land call for
Adding to a converted camp
Camps were framed light and set on posts, piers or a shallow wall. Each owner since has added a porch, closed it in, and added another. Before one more room goes on I look at what's under the floor and how the old roofs come together. Often the right job is a new foundation under the part worth keeping and an addition built to modern standards beside it, on the side away from the water.
A bedroom wing on a ranch
Colchester's permit guide lists adding a bedroom as needing a permit by itself, apart from the addition it sits in. The reason is wastewater. Septic systems are sized by bedroom count, and the town, which administers the state wastewater program, will want to know the system can take one more. Sort that out with a septic designer early. The carpentry is the easy half.
Going up on a small footprint
When setbacks and the leach field use up the yard, a second floor is what's left. The old foundation and first-floor walls have to be checked for the load by someone qualified. Near the lake, height limits and the neighbors' view of the water both come into it, the first by regulation and the second by common decency. A shed dormer across the back sometimes finds the room with less upheaval.
Building toward the water
Inside Colchester's Shoreland District, which takes in land within 250 feet of the lake's mean water mark, the direction an addition faces matters as much as its size. As the regulations read when this was written, enlarging a house in a way that doesn't push it any closer to the water inside the 100 foot setback is a permitted use. Enlarging it toward the lake is a conditional use that goes to the Development Review Board, is capped at a small share of the building, and requires showing it can't reasonably be done another way. So the practical answer on most lake lots is to add on the road side or go up. Confirm the current wording with Planning and Zoning before paying for drawings.
The projects, by name
Each one has a page of its own that says when it fits, how it goes together and what to settle first.
- Primary suite addition
- Second-story addition
- Family room addition
- Mudroom or entry addition
- In-law apartment addition
- Dormer addition
Or read the whole additions page.
Additions in Colchester: questions
Do I need a permit for an addition in Colchester?
Yes. The town's guide says any addition to an existing structure needs a Building and Zoning permit. After it's issued there's a fifteen day appeal period before work can start, and the orange permit card has to be posted where it can be seen from the road. At the end the town does a final inspection for a certificate of occupancy. Skip that last step and an open permit can hold up a sale years later.