A bathroom is the wettest room in the house and usually the smallest. Every day somebody sprays water at the walls, steams up the ceiling and walks out. Whether that room lasts ten years or forty comes down to what's behind the tile.
Tile and grout don't stop water. The waterproofing is a layer underneath, and it either got done right or it didn't. Same with the fan. It moves the damp air all the way outdoors, or it dumps it in the attic to turn to frost in January and drip in March. In fifty years I've seen plenty of handsome bathrooms that were rotten a quarter inch behind the surface.
So I look at the floor, the framing and the plumbing before talking about fixtures. If the floor is soft around the toilet, that gets dealt with first.
What that covers
Full bathroom remodel
Down to the studs and the subfloor. New plumbing and wiring by those trades, a fan ducted outdoors, insulation on the outside wall, then board, waterproofing, tile and fixtures. With the walls open is the time to move things, add blocking for grab bars and mend the joist somebody notched for a pipe.
Tile showers
A tile shower is a waterproof box with tile stuck on it for looks. The pan slopes to the drain, the membrane runs up the walls and over the curb, and it's worth flood-testing before any tile goes on. Skip that and you find out through the ceiling below.
Tub to shower conversion
Taking out a tub nobody climbs into anymore and putting a shower in its place. The drain usually has to get bigger and move, the floor under the old tub is often a surprise, and a low curb takes planning in the framing.
Accessible bathrooms
A bathroom somebody can use with a walker, a chair or a bad hip. A wider door, a shower with no curb, solid blocking in the walls for bars, a taller toilet and room to turn. Done with some thought, it just looks like a good bathroom.
Adding a bathroom
A new bath wants to be near existing plumbing, above it or beside it, with a way to run a drain at the right slope and a vent up through the roof. A basement bath may need a pump. A bathroom alone doesn't usually change the septic permit the way a bedroom does, but ask before you count on that.
Rotted bathroom floor repair
A toilet that rocks, a soft spot by the tub, a stain on the ceiling below. By the time you notice, water has been getting under the floor for a while. The fixtures come out, the rot gets cut back to sound wood, the joists get repaired and the leak gets found. Otherwise you're feeding new plywood to the same leak.
The projects, one at a time
Every one of these has its own page: when it fits, how it gets built and what to settle first.
Cold-climate bathrooms and old-house plumbing
Steam is harder on a house here than it is down south. For half the year the outside wall and the ceiling are cold, and warm wet air finds every gap. A fan sized for the room, ducted outdoors through an insulated duct and left running a while after the shower, does more for a bathroom than any tile.
Pipes in outside walls freeze. If a tub or a sink has to sit on an outside wall, the supply lines come up through the floor or stay inside the insulation. In older houses around Burlington and the villages you still find cast iron drains, galvanized supply lines and joists cut nearly through for a pipe. It's sensible to replace what can be reached while the room is apart.
Rules are light for most bathroom work but not absent. In a house built before 1978, Vermont's lead-safe rules cover paid work that disturbs paint, and old floor tile and the glue under it can hold asbestos. Burlington has its own plumbing and electrical permits. If the job adds a bedroom along with the bath, the state wastewater office needs to hear about it.
Worth knowing before you start
- If there's only one bathroom in the house, say so early. The job gets planned around it.
- Pick the shower valve, the tub and the drain before the walls are framed. They set where the pipes go.
- Put blocking in the walls for grab bars now, even if nobody needs them yet.
- A heated floor makes sense in a Vermont bathroom. It goes in before the tile, not after.
- Run the fan. Put it on a timer if the household won't.
Bathrooms by town
Burlington
Cast iron stacks, and floor joists somebody notched for a tub in 1930. The framing gets fixed before any tile goes down.
South Burlington
Original baths with a fan that blows into the attic, or no fan at all. It gets vented outdoors, and whatever the moisture has done gets repaired.
Shelburne
The ranches and capes built after the war mostly came with one bathroom. A second one fits in a corner of the basement, a big closet or a small addition. The closer it sits to the existing drain and vent stack, the less the house gets torn up. A basement bath on Shelburne clay needs the dampness dealt with first.
Williston
The usual story is a tiled shower that leaked at the curb or the corners and wet the subfloor. It comes out to the studs. The new one gets a continuous waterproof layer, a properly sloped pan and a valve that can be serviced later. While the walls are open is the time to add blocking for grab bars and to insulate the outside wall the way it should've been.
Essex
One-bath houses getting a second. Finding a route for the drain and the vent is the job. Tile is the easy part.
Colchester
The floor comes up, the framing gets repaired or replaced, and the plumbing gets rerouted so no supply line runs through unheated space. That last part is plumber's work and it matters more than the tile. A cast iron tub or a tiled shower is heavy, so the joists under it get sized for the load. Then the crawlspace below gets closed in and insulated so the floor isn't cold as a dock in November.
Milton
The standard small bathroom with a tub across the end wall. Gutting it to the studs is usually the right call, since patching around old drywall and a failing surround only hides the damage. With the walls open the plumber can replace old valves and supply lines, and I can see whether the floor framing by the tub and toilet has been wet.
Jericho
Out to the studs and down to the joists. Repair or sister the framing, let the plumber replace the old drain and supply lines while they're exposed, then build back with a waterproofed shower, a quiet fan ducted outdoors and a floor that's flat. Old houses have outside walls with little in them, so the plumbing stays on inside walls where it can't freeze.
Richmond
The hard part is the drain. A three-inch pipe has to get from the new toilet to the stack with the right pitch, and the old floor joists are in the way. Notching them is how floors get ruined. Either the pipe runs with the framing or the framing gets rebuilt to suit, and the vent goes up through the roof. Sometimes the best place for the new bath is directly over the old one or over the kitchen, for exactly that reason.
Waterbury
Everything comes out to the framing. Rotted subfloor and joist tops get replaced, the old drain and supply lines get replaced by a plumber while they're exposed, and the wet walls get a proper waterproofing system before any tile goes on. Tile and grout by themselves don't stop water. What's behind them does.
South Hero
Camp bathrooms were fitted into a corner, often on a porch that got closed in. The floor framing is light, the drain runs through an open crawlspace, and there's no fan. A proper rebuild means new subfloor, a shower built to hold water with a real pan and membrane, and a fan ducted outdoors and not into the attic.
Grand Isle
A common request in the ranches and capes along the main roads. A walk-in shower with a low curb, blocking in the walls for grab bars now or later, and a pan and membrane system put in by the book. Tile is only the finish. The waterproofing behind it is the shower.
Questions I get
How long does a bathroom remodel take?
It depends on what's behind the walls and how much tile there is. Tile work has drying and curing days that can't be hurried. I'd sooner not quote a number here and be wrong. Ask me after I've seen the room.
Can new tile go over the old tile?
Sometimes, on a floor, if what's there is sound and flat. In a shower, no. If the old shower leaked, the trouble is behind the tile, and covering it only hides it a while longer.
Why is the floor soft around my toilet?
Most often the seal under the toilet failed and water has been soaking the subfloor a little at a time. It could also be a sweating tank or a drip at the supply. Waiting won't improve it. Have it opened up before the joists get involved.
Is a curbless shower possible in my house?
Usually. The floor has to slope to the drain without a step, so the framing under the shower gets lowered or the bathroom floor gets built up. It's easier to plan in a full remodel than to add later. I look at which way the joists run before saying yes.
Do I need a permit for a bathroom?
For a straight remodel, many small towns don't ask for a zoning permit, but towns differ and one phone call settles it. Burlington requires its own permits for plumbing and electrical work. A new bathroom in an addition needs whatever the addition needs.