A bedroom and bath of your own, on the main floor

Most people who ask about a primary suite want the same thing: a bedroom and a bath on the first floor, so the stairs stop being part of every day.

When this is the right project

  • The only bedrooms are upstairs and the stairs get harder every year.
  • Everybody in the house shares one bathroom.
  • You like the house and the neighborhood and don't want to move.
  • There's room on the lot to the side or out back.

A bedroom with its own bath is two additions in one. The bedroom is easy. The bathroom is where the planning goes, because it needs water, a drain, heat and a fan, and all of that has to connect to a house that wasn't laid out with it in mind.

Where it goes on the house

Three things decide it. The lot lines, since the town's setbacks say how far out you can build. The septic, since you can't build over the tank or the field and shouldn't crowd them. And the floor plan, since the suite needs a door somewhere that doesn't run through the kitchen or eat a room you use.

I'd put it where the plumbing run is short and the drain has fall. A bathroom at the far end of a long addition, uphill of the main drain, is a headache for whoever plumbs it and for you later.

From the ground up

  • Foundation below frost, tied to the old one so the two don't part ways. A crawl space or a short frost wall is typical. If plumbing runs through it, it gets insulated and kept above freezing.
  • Floor framed to meet the existing floor dead level, with no step at the doorway.
  • Walls and roof, with the new roof tied into the old so water has an easy way off.
  • The opening cut into the house late, after the addition is weathertight.
  • Rough plumbing, wiring and heat by those trades. Then insulation, drywall and finish.

Decisions worth making early

Build it for the long run. A doorway three feet wide. A shower you walk into with no curb, and blocking in the walls for grab bars whether you want them now or not. Room beside the bed for somebody to help. None of that costs much during framing, and all of it costs plenty later.

Heat is the other one. The old boiler or furnace may have nothing left to give, so the heating contractor needs to look at it before anybody assumes. And settle the closet before the walls are drawn. A suite with a poor closet is a bedroom that cost more.

How it gets botched

The roof tie-in, mostly. A low-slope roof butted into a wall under a window, or a valley that dumps on the new door. Next is a foundation that isn't deep and isn't tied in, so the addition settles away from the house and the crack shows in the drywall every March.

A bathroom without a proper fan ducted outdoors is another. Steam has to go somewhere, and the attic is the wrong answer.

What to have ready

  • A plot plan or survey showing the lot lines.
  • Where the septic tank and field are, or the sewer line.
  • The septic permit, if there is one.
  • What you want in the bath: tub, shower, one sink or two.

An added bedroom is a wastewater question

In Vermont the septic permit is written around bedrooms. Adding one counts as more flow, so a house on its own septic system generally needs a state wastewater permit, or an amendment to the one on file, before a bedroom goes on. Sometimes the system has the room and it's paperwork. Sometimes it means a bigger field. A licensed designer sorts that out, and I'd want the answer before the foundation is laid out, since the field and the addition can want the same patch of lawn. Houses on town sewer have it easier, though the town may still want to know. An addition has to meet the state energy code, RBES, for the new part, and its footings go below frost like everything else up here.

Worth knowing before you start

  • Find the septic tank before you fall in love with a spot for the addition.
  • Turning an upstairs bedroom into an office may or may not offset the new bedroom on the septic permit. Ask the designer.
  • Match the floor height exactly. A one-inch step is the one that trips you at seventy-five.
  • Sound matters. Insulate the wall between the new bath and the bedroom.

Questions I get

Do I need a permit to add a bedroom?

A town zoning permit for the addition, almost certainly. And if the house is on a septic system, the state wastewater permit comes into it, because bedrooms are how the state counts flow. Burlington also has its own building permit and inspections. I'd make those calls before buying plans.

Can I stay in the house while it's built?

For an addition, usually yes. Most of the work happens outside the old walls until the opening gets cut through. There'll be noise, dust and a few days with the water or the power off. Ask to be told ahead when those days are coming.

Should the suite go up or out?

Out, if the whole point is to quit climbing stairs and the lot has the room. Up makes sense when the lot is tight and the legs are still good. Building out costs you yard. Building up means opening the roof.

Where I build these

Burlington, South Burlington, Shelburne, Williston, Essex, Colchester, Milton, Jericho, Richmond, Waterbury, South Hero and Grand Isle. Each link goes to what additions means in that town.

Is this your project?

Tell me about the land or the house and what you're after. I look at it first, then the price and the scope go on paper.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.

This is used to answer you about your project and for nothing else. I’ll call or email you back.

Call Harold Write to me