The Vermont building year

A house gets built on the weather’s terms, and up here the weather has firm opinions. This is what belongs in each season: the planning, the permits, the concrete, the framing and the finish work. In the hills spring comes later and winter sooner than along the lake, so shift it to suit your ground.

December into March

Winter

The ground is shut and the days are short, so this is when a job gets thought through. Most of what goes sideways in July was left undecided in February.

  • Have the old house looked at while it's coldCold tells on a house. Frost on the nail points in the attic and ice at the eaves are a lot easier to find in January than in July.Farmhouse renovation
  • Settle the drawingsMoving a wall on paper takes an eraser. The state energy code has its say on insulation, windows and air sealing too, and that's easier to meet in a drawing than in a house half framed.Energy-efficient home
  • Ask the town zoning office before you draw muchEvery town has its own setbacks and its own permit. I'd rather hear no from the zoning office in January than find out in June with a hole already dug.Detached garage
  • Start the septic and water permitA new house needs a state wastewater and potable water supply permit, and an added bedroom can need one too. That's a designer's work and the state's review, and neither one hurries.In-law apartment addition
  • Get the price and the scope in writingA price with no list of what it covers doesn't tell you much. I put both on paper, and winter gives you time to read it twice and ask about every line.Whole-house renovation
  • Do the inside workKitchens, baths and basements don't care what the sky is doing. The cold months suit a house that's torn up on the inside, so long as the heat stays on.Full kitchen remodel

Late March through May

Mud season

The frost comes out, the back roads go soft, and nothing heavy moves until they firm up. It's a season for test holes and phone calls.

  • Get the test pits dugSpring shows how wet the ground gets, and that's what a septic designer needs to know. Whether a lot can carry a house gets settled in those holes.Building on your own land
  • Check the road postings before you book a truckTowns post their back roads in spring to keep heavy loads off while the frost comes out. A concrete truck or an excavator on a trailer waits until the signs come down, and that's the town's call.New barn
  • Line up the excavationCellar holes, driveways and septic systems all want the same machines in the same dry weeks. Make the call while there's still snow in the woods.Custom home building
  • Watch where the water goesSnowmelt shows every low spot in the yard and every wet corner of the cellar. Look now, because by August it will all look dry.Basement finishing
  • See the lake lot at high waterLake Champlain usually runs highest in spring. Go see how close it comes, and ask about shoreland and flood rules before anybody draws a foundation.Lakefront home
  • Check the porch and the deck for frost heaveFrost lifts a shallow footing and doesn't always set it back where it found it. Spring is when a porch shows whether it moved over the winter.Old porch rebuild

June through August

Summer

This is the stretch the rest of the year points at. Holes get dug, concrete gets poured, frames go up and roofs go on, and every trade is busy at once.

  • Get the foundation inFootings here go down below the frost, and that makes for a deep hole. It's a lot easier to dig, form and pour in dry ground with long days.Family room addition
  • Frame it and get it under a roofFraming lumber can take some rain, but it shouldn't have to take much. The sooner the roof and the wrap are on, the drier the inside of that house stays for good.Small house or cottage
  • Open the roof in dry weatherA second story or a dormer leaves the house open to the sky for a while. That's work for a settled stretch of weather, with the tarps close by anyway.Second-story addition
  • Fix sills and beams while the ground is drySill work means jacking the house and opening its bottom edge to the weather. Dry ground under the jacks and warm air on the open wall make it a summer job.Sill, beam & structural repair
  • Build the deck or the porchPost holes dig cleaner in dry ground, and stain and paint want warm, dry days to cure.New deck
  • Work on the camp while you can get to itPlenty of camp roads don't get plowed, and an island lot is a long haul for materials any time of year. Summer is when a camp is easy to reach and easy to open up.Camp conversion to year-round

September through November

Fall

Fall is a race, and the snow doesn't send a notice. The aim is a tight shell and the heat on before the ground locks up.

  • Close it in before snowRoof, windows, doors and housewrap, in that order of worry. An addition that's open to the house is a hole in the house until it's closed.Primary suite addition
  • Pour concrete before hard frostConcrete can't be allowed to freeze while it cures, and it can't go down on frozen ground. Every cold night makes a late slab or footing more trouble.Attached garage
  • Get the heat onDrywall compound and paint both need a warm house, and so do the pipes. Heating is its own trade, and it wants lining up well before the first cold snap.Tear down and rebuild
  • Seal and insulate the attic before ice dam seasonIce dams start with house heat leaking into the roof. Stop the leaks and add the insulation in fall, before the first heavy snow sits up there.Attic conversion
  • Move the work insideOnce the shell is tight, the tile and the trim can go on through the cold. A bathroom is a good job for the short days.Full bathroom remodel
  • Start talking about next yearDrawings and permits take months, and neither one needs good weather. The jobs that break ground in spring were mostly being planned the fall before.New Homes

Reading that goes with the calendar

  • Building weather: Pick a town. See which days this week will take concrete, framing and roofing, or paint and stain.
  • Concrete calculator: Slabs, footings and piers added into one order, in cubic yards, with bags counted for the small pours.
  • The project brief: A short set of questions about the job. Out comes a one-page brief and a list of what to find out before the first call.
  • The guides: land, permits, frost, the energy code and old houses, each at more length than a calendar allows.

Planning for next season?

The talking, the drawing and the permits take longer than most people figure, and all of it comes before the digging. Tell me what you have in mind.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.

This is used to answer you about your project and for nothing else. I’ll call or email you back.

Call Harold Write to me