New houses, from the hole in the ground to the front door key

Houses built from the ground up, on your own land or a lake lot, from the Islands to Waterbury Center.

I've been building houses for fifty years, from the northern Champlain Islands to Waterbury Center and the towns in between. A new house is the biggest thing most people ever pay for. It ought to be built by somebody who'll tell you the truth about your land, your plans and your money before the first stake goes in.

Most of what matters in a house gets buried or covered up. The footing, the drainage, the way the frame is tied down, the flashing behind the siding. Nobody admires any of it at the housewarming. It decides whether the place is dry and square forty years on, so that's where I put the worry.

I start by walking the land with you. After that the price and the scope go in writing, so you and I both know what's being built.

What that covers

  • A custom house on your own plan

    A house laid out for your family and your lot instead of pulled out of a catalog. Bring the plans if you have them. The first thing I check is whether the house fits the land it's going on.

  • Building on land you already own

    Raw land needs a lot before it needs a house: a driveway the trucks can use, power, water, and a septic design the state will permit. Sort those out first. A good many lots that look easy from the road are not.

  • Lakefront houses

    The lake gives you the view and takes it out of the building. Wind-driven rain, ice, high water some springs, and state shoreland rules inside 250 feet of the water. A lake house wants better flashing, tougher siding and a foundation set with the high-water years in mind.

  • Energy-efficient houses

    Every new house in Vermont has to meet the state energy standards anyway. Going past them is mostly a matter of care: more insulation, a tight shell, good windows put in right, and fresh air brought in on purpose. Heat you don't lose is heat you don't buy.

  • Small houses and cottages

    A small house still needs a foundation, a septic system, a kitchen and a bath, so those take a bigger share of the money than people expect. What you get back is a place that's easy to heat and easy to keep.

  • Tear down and rebuild

    Sometimes the old house or camp is past saving and the lot is the valuable part. Before anything comes down, ask the town what you're allowed to put back. An old building close to the lake or the lot line may have rights a new one doesn't, and they can be lost with the first swing of the excavator.

The projects, one at a time

Every one of these has its own page: when it fits, how it gets built and what to settle first.

Frost, clay, ledge and the lake

The ground changes every few miles up here. Much of the Champlain Valley floor is heavy clay left by the old glacial lake, and it holds water from late fall into spring. On the Islands the ledge is often a foot or two under the sod. Head east toward Jericho, Richmond and Waterbury and you get hills, boulders and more ledge. Each one calls for a different foundation and a different plan for getting water away from it. I look at the ground before I say anything about the house.

Footings go down below frost, which around here means four feet or better, and the roof has to carry real snow. Neither one is the place to save money.

Paperwork comes before digging. The town issues the zoning permit. The state issues the wastewater and water supply permit for a new house, and a licensed designer has to do that design. Inside 250 feet of the lake the Shoreland Protection Act applies. Burlington adds its own building permits and inspections, and a few other towns have rules of their own. Many towns don't inspect the building of a single-family house at all, which makes the builder you pick matter more. When the house is done, the state energy code calls for a signed certificate posted in the house and filed with the town clerk. Ask the town zoning office before you draw anything.

Worth knowing before you start

  • Start the septic design and the state wastewater permit early. The rest of the plan hangs on where the system can go.
  • Walk the lot in April when the snow is going out. You'll see where the water runs and where it sits.
  • Ask any builder, me included, for a state registration number, proof of insurance and a written contract.
  • Leave money in the budget for the ground. Ledge and wet clay don't show on a set of house plans.
  • Pick the windows, the heat and the kitchen layout before framing starts if you can. Changes made on paper are easy. Changes made in lumber are not.

New Homes by town

  • Burlington

    Some old houses are past fixing. The sills are gone, the foundation has moved, and every dollar put in goes to holding the place up. A new house on the same lot gets city water, sewer and a street address that already exist, which is worth a lot. Don't assume the new one can sit where the old one sat. Setbacks and lot coverage rules have changed since the first house went up. And if the old place is listed on a historic register, or old enough to be eligible, the city reviews taking it down. Settle both questions before a machine shows up.

  • South Burlington

    On a lot in a newer development, much has been decided before the builder arrives. The plat shows where the house may sit. Covenants or an owners' association may dictate siding, roof pitch, garage placement and how big the house must be. Stormwater from the whole neighborhood is handled by a system the city approved, and a single lot can't undo it by regrading. I read every one of those documents before anything gets drawn, because the lot only looks like a blank slate.

  • Shelburne

    New houses on the remaining land east of Route 7 and the odd lake lot. Septic, ledge and the driveway grade get settled before the house plan does.

  • Williston

    New houses on hill lots toward Lake Iroquois and the south end of town. Site work can be a bigger share of the job than people plan on.

  • Essex

    Up along Old Stage Road, Brigham Hill and the back roads beyond, a lot comes with room and with homework. A soil test and a septic design come first, done by the people whose trade that is, because where the leach field can go decides where the house can go. Ledge shows up in the hills without warning. I'd want test holes dug where the cellar is going before anybody falls in love with a walkout basement.

  • Colchester

    Tear down and rebuild on a lake lot. The footprint and height allowed are often tied to what was there, so measure the old camp before it goes.

  • Milton

    New houses on rural lots. Well, septic, power and driveway come before the foundation, and together they're a real part of the cost.

  • Jericho

    New houses on wooded, sloped lots. The driveway, the well and the septic field get located first, and the house takes what's left.

  • Richmond

    Hillside houses on ledge. Sometimes the foundation gets pinned to rock and sometimes the rock gets hammered out, and the plan should allow for either.

  • Waterbury

    New houses on hillside lots around the Center. Site work, a long driveway and a drilled well are part of the house and should be counted that way from the start.

  • South Hero

    New houses on lake lots and old fields. The wastewater design and the depth to ledge come first, and the house plan follows them.

  • Grand Isle

    Replacing a worn-out camp with a year-round house. Measure and photograph the old one before demolition, since what you may rebuild can hang on it.

Questions I get

Do I need plans before I call?

No. If you have plans, bring them. If all you have is a lot and a rough idea, that's enough to start talking. Somebody has to draw the house before it can be priced, and depending on the house and the site an engineer may need a hand in it.

Can you look at a lot I haven't bought yet?

Call before you buy it. A lot is only a building lot if it can get a septic permit, a driveway and a zoning permit. I'd rather tell you what I see while you can still walk away.

Can a house be built through the winter?

A house can be framed in the cold. Digging and concrete are the hard part. A foundation is better poured before the ground freezes, so the season you start in matters. Plan backward from that.

What will a new house cost?

I can't price a house I haven't seen plans for on land I haven't walked, and I'd be wary of anybody who does. The ground, the size, the finishes and the distance to power all move the number. Once I've looked, the price and the scope go on paper.

Who gets the permits?

The town zoning permit and the state wastewater permit have to be in hand before work starts, and the state permit takes a licensed designer. Who files what gets settled when the job is talked over. Either way, nothing gets dug until the paperwork says it can.

Have a project like this in mind?

Tell me where it is and what you want built. I'll come look at the land or the house, and the price and the scope go in writing.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.

This is used to answer you about your project and for nothing else. I’ll call or email you back.

Call Harold Write to me