Up the Winooski · Chittenden County · 05477

Richmond: river bottom below, ledge above

The Winooski River made Richmond and still has a say in it. The village sits on the flat beside the river, with the Round Church across the bridge, and the best farmland in town is the floodplain on either side. That flat ground floods. It did in 2011 and again in 2023, and it will again. Anybody building or remodeling near the river has to start from that fact.

Go a half mile from the river in most directions and you're climbing. Huntington Road, Wes White Hill, Dugway Road: steep, wooded, with ledge close under the leaves. So Richmond hands a builder two opposite problems. Too much water on the bottom, too much rock on the hill.

The Old Round Church in Richmond, a white sixteen sided wooden meetinghouse with a cupola
The Old Round Church. Sixteen sides, built in 1812 and 1813. Photo: Mcrenn88, CC BY-SA 3.0, via Wikimedia Commons. Resized.

Village houses and hillside houses

The village is nineteenth-century: frame and brick houses on Bridge Street, Main Street and the short streets off them, a number of them with a barn attached or just behind. Stone foundations, low cellars. In a cellar that takes water now and then, I wouldn't finish anything. Furnace, panel and water heater go up as high as they can go, the cellar gets materials that can stand a soaking, and the living space stays upstairs.

Jonesville, upriver, is a smaller version of the same thing, strung along Route 2 between the river and the hill. Old houses close to the road, the railroad right there, the river just beyond.

The hills hold the newer houses, from the 1970s to last year, on long driveways. Capes, timber frames, contemporaries pointed at Camels Hump. They were sited for the view, and sometimes the view won an argument with the drainage that it should have lost. Uphill water against the back wall, walkout basements that leak at the corner, decks hung high off the downhill side. Those are the hillside troubles. For a new house on that ground I'd spend real time on where the water goes before anything else gets decided.

What gets built in Richmond

  • Remodeling & Renovation

    Old village houses: sills, cellars, wiring, insulation. In the flood-prone ones, the mechanical equipment moves up out of harm's way first.

  • New Homes

    Hillside houses on ledge. Sometimes the foundation gets pinned to rock and sometimes the rock gets hammered out, and the plan should allow for either.

  • Additions

    An addition in the village has to clear zoning and, near the river, the flood rules. On the hills the limit is usually the septic.

  • Porches & Decks

    Tall decks on the downhill side. Posts that high need real footings, real bracing and hardware sized for the load.

  • Garages & Barns

    Garages cut into a slope, and repairs to the old barns behind village houses, starting with the roof and the sills.

All seven kinds of work, as they go in Richmond: new homes, additions, remodeling & renovation, kitchens, bathrooms, garages & barns and porches & decks.

Richmond's flood overlay and zoning

Richmond's zoning has a Flood Hazard Overlay District tied to the federal flood maps. Development inside it needs a zoning permit and has to meet the overlay's standards, which win out over the regular district rules where the two conflict. The town has been revising that section, so get the current version from the Planning and Zoning office. Flood rules of this kind usually say that if a house gets improved past a certain share of its value, the whole building has to be brought up to flood standards, and that can turn a remodel into a much larger job. Ask about it before you plan a big renovation near the river. Up on the hills it's the usual list: a zoning permit, a state wastewater permit for a new house or added bedrooms, and the state energy standards.

Parts of Richmond

  • Richmond Village

    Stand on the Bridge Street bridge in Richmond and you can see the whole situation. The Round Church on one bank, two centuries old. Volunteers Green and the village on the other. And the Winooski in between, looking peaceful most days. In July 2023 it filled the green and closed Bridge Street. By July 2024 it had flooded that end of the village three times in a year.

Roads and places

Richmond village, Bridge Street, Round Church, Jonesville, Volunteers Green, Cochran Road, Huntington Road, Hinesburg Road, Jericho Road, Dugway Road, Wes White Hill Road, Winooski River.

Thinking about building in Richmond?

Tell me the road and what you have in mind: new house, addition or an old place that needs work. I look at it before I say much.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.

This is used to answer you about your project and for nothing else. I’ll call or email you back.

Call Harold Write to me