The kitchen takes more abuse than any room in the house. Water, heat, grease, kids, dogs, and a door to the outside that gets opened forty times a day. It also packs the most trades into the least space: plumbing, wiring, gas or electric, venting, cabinets, tops and tile.
So a kitchen job is mostly a matter of order and fit. Things have to happen in the right sequence, and the cabinets have to go into a room that's been made flat and plumb enough to take them. In an old house that's half the work.
My advice is plain. Spend on the layout and the cabinet boxes. Don't move the sink unless moving it fixes something. Pick everything before the old kitchen comes out, because a kitchen torn apart and waiting on a decision is a hard way to live.
What that covers
Full kitchen remodel
Everything out to the studs, then new wiring and plumbing, insulation in the outside walls, cabinets, tops and floor. It's the time to fix what the last two remodels covered up.
Opening up a kitchen
Taking out the wall between the kitchen and the next room. The first question is whether it holds up the house. If it does, a beam and posts carry the load down to something solid, and an engineer sizes them. Pipes, wires and ducts in that wall have to find a new home too.
Cabinet installation
Good cabinets hung badly look like bad cabinets. They get set level off the high point of the floor, scribed to walls that wander, and fastened to framing. The countertop only sits as flat as the boxes under it.
Kitchens in old houses
Floors that drop two inches across the room, plaster walls, a chimney in the wrong place, nothing behind the sink but boards. An old-house kitchen takes more carpentry before the cabinets arrive. It should also keep some of what makes the house what it is.
Kitchen bump-out
When the room is just too small, pushing an outside wall out a few feet can do what no layout will. It's a small addition, with a foundation, a roof and a zoning permit to match.
Islands and pantries
An island needs room to walk around it, more than most people leave. If it has a sink or a cooktop, the plumbing and wiring come up through the floor, which is easy over a basement and harder over a slab. A pantry with plain shelves holds more than a wall of fancy cabinets.
The projects, one at a time
Every one of these has its own page: when it fits, how it gets built and what to settle first.
Cold walls, old floors and other northern kitchen troubles
Sinks like to sit under a window on an outside wall, and that's where pipes freeze. In this climate the supply lines belong on the warm side of the insulation or up through the floor. The wall behind the cabinets gets insulated and sealed while it's open, since nobody will see it again for thirty years.
A range hood that vents outdoors is worth having. A big one in a tight house pulls out more air than leaks in, so make-up air has to be thought about, and the duct wants a short run to a cap that won't fill with snow.
Most kitchens in the older parts of Burlington, the villages and the farmhouses have been redone two or three times, each layer on top of the last. Floors are often built up several layers thick, and the oldest layers can be the kind that shouldn't be broken up without testing for asbestos. In a house built before 1978, Vermont's lead-safe rules apply to paid work that disturbs paint. A bump-out or any change to the outside needs the town's zoning permit, and Burlington has building, electrical and plumbing permits of its own. Ask before the dumpster shows up.
Worth knowing before you start
- Don't tear out the old kitchen until the new cabinets are in hand or close to it.
- Set up a temporary kitchen somewhere with a sink. Washing dishes in the bathtub gets old fast.
- Leaving the sink, range and refrigerator near where they are saves plumbing and wiring work.
- Put the money in the cabinet boxes, the drawer hardware and the layout. Door styles go out of fashion. Good drawers don't.
- Decide on appliances before the cabinets are ordered. Their sizes drive everything else.
Kitchens by town
Burlington
Old Burlington kitchens are small rooms at the back with a chimney in the way. Taking out a wall usually means a beam and a post carried down to something solid.
South Burlington
Seventies and eighties kitchens, walled off from the rest of the house. Opening one up usually means a bearing wall and a beam an engineer has sized.
Shelburne
Farmhouse kitchens in a rear ell, usually the least solid part of the house. Floor framing and sills get checked before cabinets are ordered.
Williston
Nineties kitchens with builder cabinets and a soffit hiding ductwork. Find out what's in the soffit before anybody promises it can go.
Essex
Galley kitchens from the sixties with a wall between the cook and the company. Often that wall carries the ceiling joists, so it gets a beam.
Colchester
Kitchens in the postwar houses inland. Usually small, usually up against the one wall with all the plumbing in it.
Milton
The soffits come down, the peninsula goes, and the wall to the dining room often opens up. That wall may be carrying the floor or roof above, so it gets checked and a proper beam goes in if one is needed. With the room open, the range hood finally gets ducted outside, which in a tight Vermont house matters more than the cabinet finish.
Jericho
Village house kitchens with low ceilings and floors that run downhill. Level what can be leveled and scribe the cabinets to the rest.
Richmond
The floor comes up, or at least gets a hard look from below. Joists get sistered or replaced, the crawlspace gets a ground cover and insulation, and the plumbing moves in from the outside walls where it can. Then the floor goes back flat and level, because cabinets and stone tops don't forgive a floor that isn't. All of that is invisible when the job's done, and it's the part that makes the kitchen last.
Waterbury
Farmhouse kitchens in the Center, usually in an ell on a shallow foundation. Frost has been moving that floor for a century, so look underneath first.
South Hero
Moving the kitchen toward the view, or opening it to the main room, means taking out a wall that's usually doing some work and redoing plumbing that was run the short way decades ago. Done inside the existing walls, it stays clear of the shoreland rules. Push a wall outward and it doesn't.
Grand Isle
Down to studs and joists. Level the floor, or at least make it flat. Fix what the old sink leaked on, insulate the outside walls, and give the trades open framing to run new wiring and plumbing. Then drywall, cabinets, counters. In a house built before 1978, the demolition falls under Vermont's lead paint rules for paid work.
Questions I get
How long will I be without a kitchen?
Longer than you'd like. It depends on the size of the job and on the countertops, since tops get measured after the cabinets are set and made after that. I won't put a number here. Having every choice made before demolition is what shortens it most.
Can that wall come out?
Nearly any wall can come out if something else takes over its job. Whether it's worth doing depends on what's in the wall and what's on top of it. I look in the cellar and the attic to see what it's carrying. If it holds up a floor or a roof, an engineer sizes the beam.
Should I keep my old cabinets?
If the boxes are solid and the layout works, they may be worth keeping and refitting. If the layout is the problem, new doors on old boxes won't fix it. I'll tell you which you have.
Who does the plumbing and electrical?
A kitchen needs a plumber and an electrician, and those are trades of their own. Their work has to land in the right order with the carpentry. Ask me how that gets handled on your job when you call.
What kind of floor holds up in a kitchen?
One that shrugs off water and grit. Tile lasts if the floor under it is stiff enough. Good sheet flooring takes water well. Wood is fine if you accept that it'll show wear by the sink and the door. Whatever goes down, the subfloor gets flattened and stiffened first.