On an old Richmond farmhouse the kitchen is usually in the ell, the low wing that got tacked on the back after the main house was up. It was built cheaper than the house, often over a shallow crawlspace, and it's been the coldest floor in the building ever since.
That's the first thing I'd look at, well before cabinets. What's under the floor, whether the pipes down there have frozen, whether the ell has settled away from the house. A kitchen is a lot of money to set on a bad floor. The later houses up the hill roads don't have that trouble. Their kitchens are just small and closed in, which is an easier thing to fix.

What Richmond houses and land call for
A kitchen in the back ell
The floor comes up, or at least gets a hard look from below. Joists get sistered or replaced, the crawlspace gets a ground cover and insulation, and the plumbing moves in from the outside walls where it can. Then the floor goes back flat and level, because cabinets and stone tops don't forgive a floor that isn't. All of that is invisible when the job's done, and it's the part that makes the kitchen last.
Opening the kitchen to the next room
People want the wall between the kitchen and the dining room gone. Fine, once it's known what the wall is holding. In a balloon-framed house it may be carrying the floor above and hiding a chimney, old wiring and a heat run. It takes a beam sized by somebody qualified, posts under the beam, and footings under the posts. Then the wall can go.
A kitchen on a well and a septic tank
Off the village lines, the kitchen runs on your own water and drains to your own tank. Have the well water tested before choosing fixtures and a dishwasher, since hard or iron-heavy water is rough on both. Go easy on a garbage disposal with a septic system. And most hill roads have no gas main, so a gas range means a propane tank outside and a qualified person to pipe it.
Getting cabinets and stone up the hill
Kitchen parts are heavy and they come by truck. Gravel roads get posted against heavy loads during mud season, and a steep driveway in March can stop a delivery truck that made it up the road fine. I'd plan a hill-road kitchen so the big deliveries land before the roads soften or after they firm up, and I'd call the town highway department to learn when the postings go on. Winter has its own version: stone countertops and cabinets don't like being carried across ice, and they don't like sitting in an unheated garage either. None of this means waiting a year. Look at the calendar before ordering, that's all.
The projects, by name
Each one has a page of its own that says when it fits, how it goes together and what to settle first.
- Full kitchen remodel
- Kitchen wall removal
- Cabinet installation
- Old-house kitchen remodel
- Kitchen bump-out
- Kitchen island or pantry
Or read the whole kitchens page.
Kitchens in Richmond: questions
Does a kitchen remodel in Richmond need a zoning permit?
Work that changes the outside of the house, like a bump-out or a new entry, needs one. For work that stays inside the walls, ask the Zoning Administrative Officer instead of taking my word or anybody else's. It's one phone call. A house in the flood hazard area should ask no matter how small the job looks.
How do I keep the price from growing?
Decide things before the work starts, and have the scope and the price written down. The surprises in a kitchen are behind the walls and under the floor, and I'll show you those when I find them. The other kind of surprise, the changed mind in week three, is the one you control.