When this is the right project
- You have land, or a line on some, and no house on the market fits it.
- You plan to stay long enough that how it's built matters more than how fast.
- You've got a list of things every house you've lived in got wrong.
- You'd sooner pay for a good shell than a fancy finish.
Start with the ground
A custom house starts with the lot, long before anybody argues about countertops. Where the water goes in April. Where the sun is in January. Where the ledge is, and how deep the clay runs. I walk the land before I'll talk about a plan, because the land has already made some of the decisions and it's cheaper to find out which ones early.
Then there's the paperwork that goes with the ground. Unless town sewer and water run by, a new house needs a state wastewater and potable water supply permit, and a licensed designer has to test the soil and draw the system. The town wants a zoning permit. Where the septic can go often decides where the house goes, so that gets settled first.
The order of things
From there it runs about the same on every house.
- Site work: driveway, clearing, the hole, and drainage around it.
- Foundation, down below frost, with the drains and waterproofing on before backfill.
- Frame, roof and windows, so the weather's outside.
- Wiring, plumbing and heat roughed in by the trades that do those.
- Insulation and air sealing, then drywall.
- Finish: floors, trim, cabinets, paint.
The first three are where a house is made or ruined. Nobody will ever see them again, which is exactly why they get skimped.
Where to spend and where to hold back
Spend on what you can't change later. The foundation and its drainage, the frame, the roof, the windows, and the insulation and air sealing behind the drywall. Hold back on what you can swap out in ten years without a saw, like light fixtures and counters. A plain house built right can be dressed up any time. A dressed-up house built wrong stays wrong.
Keep the shape simple. Every jog in a foundation and every valley in a roof is a place for water and cold to get in, and somebody has to be paid to build it. A plain rectangle with a good roof over it has been outlasting clever houses around here for a couple hundred years.
What goes wrong when corners get cut
Mostly it's water. A footing drain that goes nowhere. Backfill made of the same clay that came out of the hole. Windows set without flashing because the siding will cover it. A basement slab poured on wet ground with nothing under it. None of that shows the day you move in. It shows in the third or fourth spring, and by then the fix means digging.
The other one is changing your mind after the frame is up. Moving a wall on paper is free. Moving it in lumber is a bill and a delay.
What to have ready
- A survey, or at least good boundary pins.
- Whatever you know about septic, well and power on the lot.
- A rough list of rooms and how you live. That's more use to me than magazine pictures.
- A number you can truly spend, said out loud early.
Frost, clay and the paperwork up here
Frost goes deep in northern Vermont, so footings here go down four to five feet, and deeper where an engineer or the town says so. Down in the Champlain Valley a lot of the ground is heavy clay that holds water against a wall, and out on the Islands the ledge can sit close under the sod. Either one changes the foundation and the septic. Every new house has to meet the state energy code, the Residential Building Energy Standards, and the builder signs a certificate saying so. It gets posted in the house and a copy goes to the town clerk. Zoning is town by town, and Burlington runs its own building permits and inspections on top of that.
Worth knowing before you start
- Vermont registers residential contractors through the Office of Professional Regulation for jobs of $10,000 and up, and requires a written contract. Ask any builder for a registration number and proof of insurance, me included.
- The price and the scope go in writing before any dirt moves.
- Get the septic design and the zoning answer before you pay for finished house plans.
- Pick the windows and the heating system early. Both change the framing.
Questions I get
Do I need plans drawn before I call?
No. A sketch on a napkin and a walk around the lot is a fine start. Finished drawings come after the land has had its say, and I'd hate to see you pay for a plan the septic won't allow.
Can a house be built through the winter?
Houses get framed in winter here all the time. Excavation and concrete are the fussy parts, since frozen ground and fresh concrete don't get along, so the hole and the foundation are better done before hard frost. After the roof is on, the calendar matters a lot less.
How do I find out what it will cost?
Not from a website, and not from a per-foot number passed along secondhand. It depends on the ground, the size and what goes in it. Once there's a plan and I've seen the lot, I put a price and the scope in writing.
Where I build these
Burlington, South Burlington, Shelburne, Williston, Essex, Colchester, Milton, Jericho, Richmond, Waterbury, South Hero and Grand Isle. Each link goes to what new homes means in that town.