When the lot is better than the house on it

Some houses have earned another lifetime and some haven't. Knowing which one you own is the first job, and I'd sooner tell you to keep a house than knock down one that had life left.

When this is the right project

  • The foundation is failing and the frame has followed it.
  • Fixing what's wrong adds up to more than the house is worth to you.
  • You love the location and can't stand the house.
  • It's a seasonal camp and you want a year-round home.
  • Every wall you'd want to move turns out to be holding something up.

Keep it or take it down

I look at four things: the foundation, the frame, the water and the layout. A house with a sound foundation and a straight frame is worth saving even if every surface in it is ugly. A house on a crumbling foundation, with rot in the sills, a wet cellar and rooms in the wrong places, is asking you to pay for a new house and get an old one.

Old doesn't mean done, either. Plenty of farmhouses around here have frames that will outlast anything built this year, and a tired ranch from the sixties can be a perfectly good box. I say what I see, and it doesn't always come out as the bigger job.

What the old house leaves you

Taking a house down doesn't wipe the lot clean, and that's partly good news.

  • The driveway, the power, the well and maybe the septic are already there. Whether the septic can serve the new house is a question for a licensed designer and the state. It hangs on bedroom count and the shape the system is in.
  • The old house may sit closer to the road, the lot line or the water than today's zoning allows. Towns treat that in different ways, and some of what you're allowed can hang on what's standing now. Talk to the zoning office while the old house is still up.
  • Before a building is demolished, Vermont requires an asbestos inspection by a licensed inspector and a notice filed ahead of time with the Department of Health. Anything found gets removed by a licensed abatement contractor first.

The work, in order

Permits and the asbestos inspection. Utilities shut off and capped by the people who own them. Demolition and hauling, with the old cellar hole dug out, or once in a while reused. After that it's a new house like any other: foundation, frame, roof, the trades, insulation, finish.

I'm slow to build on an old foundation. If it was good enough to carry a new house, the old house probably wasn't bad enough to tear down.

How this goes sideways

Knocking it down before the permits are in hand is the expensive mistake. People assume they can put back what was there, then learn the new house has to meet today's setbacks, or that the septic permit won't cover the bedrooms they drew.

The other one is the buried surprise. An old fuel tank, a dug well under the lawn, a cellar hole somebody filled with whatever was handy. Save some worry for what's underground.

What to bring

  • Any survey, septic permit or old plans.
  • The year the house was built, as near as you know.
  • A list of what's wrong with it, in your own words.
  • Where you'll live while it's happening.

Camps, clay and the rules on what's already there

Around Lake Champlain a lot of rebuilds start as seasonal camps on small lots. Within 250 feet of the lake the state Shoreland Protection Act comes into it, the town's shoreland and flood rules do too, and the old camp's septic is seldom fit for a year-round house. Inland, the usual culprit is a stone or block foundation that the frost and the valley clay have been leaning on for generations. A new foundation goes down below frost with real drainage around it, which is the main thing the old house never had. The new house also has to meet the current state energy code, RBES, the same as any new house.

Worth knowing before you start

  • Don't let anyone start demolition until the asbestos inspection and the state notice are done.
  • Salvage what's worth it before the machine arrives. Old beams, doors and wide boards have a second life in them.
  • Photograph and measure the old house, and where it sits on the lot, before it comes down. The town may ask.
  • Call the utilities early. Disconnects run on their schedule.

Questions I get

Can I rebuild on the same footprint?

Often you can, and sometimes that's the only place the town will let you build. It depends on the zoning district, how long the house has been gone and whether it sat inside today's setbacks. Get the answer from the zoning office in writing before the old house comes down.

Is it cheaper to renovate or to rebuild?

That turns on the foundation and the frame more than anything. If both are sound, renovating usually wins. If both are shot, you're paying for a new house either way and you may as well get one. I look at the house and tell you which I think it is, and why.

Can I reuse the existing septic system?

Possibly. That's a question for a licensed designer and the state regional office. It turns on the permit on file, the number of bedrooms in the new house and whether the old system is working. Don't assume it either way.

Where I build these

Burlington, South Burlington, Shelburne, Williston, Essex, Colchester, Milton, Jericho, Richmond, Waterbury, South Hero and Grand Isle. Each link goes to what new homes means in that town.

Is this your project?

Tell me about the land or the house and what you're after. I look at it first, then the price and the scope go on paper.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.

This is used to answer you about your project and for nothing else. I’ll call or email you back.

Call Harold Write to me