Setting new cabinets level in a house that isn't

New cabinets in the same layout. It's a smaller job than a full remodel, but the boxes only sit as well as the floor and the walls let them.

When this is the right project

  • The layout works fine. The cabinets are what's worn out.
  • The sink and the range can stay right where they are.
  • Doors sag, drawers are falling apart, shelves have bowed.
  • You're replacing the counters and don't want new stone on old boxes.

Cabinets are boxes, and boxes are square. Houses mostly aren't. Fitting the one into the other is the whole job.

Before anything is ordered

The room gets measured, and measured again by whoever is building the cabinets. I check the floor for level across the whole run and the walls for plumb and for bows. Corners are rarely square. All of that goes into the order, because it decides where the filler strips go and how tall the toe kick needs to be. Appliance sizes go in too, from the spec sheets, not from memory.

Then there's the wait. Cabinets take time to build and ship, and the old kitchen ought to stay put until the new one is sitting in the garage, opened and checked.

How they go in

  • Find the high spot in the floor. The base cabinets start there and the others get shimmed up to match.
  • Snap a level line around the room for the tops of the bases and the bottoms of the uppers.
  • Uppers usually go first, so nobody has to lean over base cabinets to hang them.
  • Screws go into studs or into solid blocking. Plaster alone holds nothing.
  • Bases get leveled front to back and side to side, fastened to each other, then to the wall.
  • End panels and fillers get scribed to the wall so the gap closes without a fat line of caulk.

A stone countertop doesn't bend. If the base cabinets aren't level and in one plane, the stone rocks, or cracks, or sits on a stack of shims with a gap somebody tries to hide. Level boxes are what the counter is counting on.

Behind the old ones

Pull out old cabinets and you find the part of the kitchen nobody finished. No flooring under them, or a different floor. Plaster missing behind the sink base. A slow leak that's been feeding the subfloor. Signs of mice. Over the uppers there may be a soffit, and it's either empty or full of ducts and pipes, and you don't know which until it's opened. If the floor under the sink is soft, that gets fixed before a new cabinet goes on top of it.

Decisions that matter

If the floor is being replaced too, settle the order. Run the flooring under the cabinets and the dishwasher slides in and out without a fight. Stop the flooring at the toe kick, and a thick new floor can trap the dishwasher behind a lip for good.

Bare walls are also the one chance to add outlets or circuits without tearing into anything finished. That's electrical work and the job may well need it.

What to have ready

Appliance model numbers. The sink you want, since it sets the size of the sink base. Empty cabinets on the day. And a clear path from the door to the kitchen, because the tall ones don't turn corners well.

Old floors, cold corners and long lead times

A farmhouse kitchen around here can be out of level by an inch or more from one end to the other, because the house settled toward the chimney or a sill gave way a long time back. On a floor like that the choice is to flatten the floor first, or to shim the cabinets and cover the difference with a taller toe kick. I want to know which before the order goes in, since it changes the heights. Cabinets on an outside wall also hide whatever insulation is or isn't there. With the old ones out, it's the one time you can get at that wall, seal around the pipes and wires, and keep the sink lines from freezing. Lead times for cabinets can run long. Get the delivery date in writing and keep the old kitchen working until the truck shows up.

Worth knowing before you start

  • Countertops are measured off the installed cabinets. Nothing gets cut from a drawing.
  • Fillers and scribe strips are how a square box meets a crooked wall. They belong there.
  • Open every box and check for damage the day the cabinets arrive, before the old kitchen comes out.
  • Under-cabinet lights and their wiring get planned before the uppers go up.

Questions I get

Can I keep my countertops and replace only the cabinets?

Laminate tops, sometimes. Stone, rarely. It was fitted to the old boxes, it's heavy and brittle, and it tends to break coming off. Figure on new counters with new base cabinets, and be glad if the old ones survive the trip.

How long do cabinets take to come in?

That depends on who builds them and what you pick, and it changes from year to year. I won't put a number on it here. Get the date in writing with the order, and don't schedule a tear-out against a date nobody has confirmed.

Should the old cabinets be painted or refaced instead?

If the boxes are solid and the layout suits you, new doors or paint is a fair way to go and a lot less disruption. If the boxes are swollen, sagging or coming apart at the joints, you'd be putting new doors on a problem.

Where I build these

Burlington, South Burlington, Shelburne, Williston, Essex, Colchester, Milton, Jericho, Richmond, Waterbury, South Hero and Grand Isle. Each link goes to what kitchens means in that town.

Is this your project?

Tell me about the land or the house and what you're after. I look at it first, then the price and the scope go on paper.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.

This is used to answer you about your project and for nothing else. I’ll call or email you back.

Call Harold Write to me