A full kitchen remodel, from the studs back out

This is the whole room taken apart and put back right. Layout gets settled first, then whatever is behind the walls, and the pretty parts come last.

When this is the right project

  • The layout fights you every day, and new cabinet doors won't change that.
  • The floor is soft or sloped near the sink or the dishwasher.
  • There aren't enough outlets, and a breaker trips when two things run at once.
  • The cabinet boxes are coming apart, not only looking tired.
  • You plan to stay in the house long enough to get the good of it.

A full remodel means everything comes out. Cabinets, counters, flooring, usually the plaster or drywall too, so the framing, the pipes and the wiring are all in plain sight. That's the point of it. You get one chance to fix what's behind the walls while they're open, and it's a poor time to be shy.

Layout first, finishes last

Most people start with the countertop color. I'd start with where the sink goes. Where you stand to cook, which way the fridge door swings, how two people get past each other, where the groceries land when you come in from the car. Draw that on paper until it works. Moving a line on paper is free. Moving a sink after the plumbing is roughed in is a different conversation.

Once the layout holds, the cabinets get ordered, because they take the longest to show up. Tile, paint and hardware can wait. They go in last anyway.

The order the work goes in

  • Tear out, down to studs and subfloor where the room calls for it.
  • Fix what turns up: rot, sagging joists, framing hacked up around old pipes.
  • Any structural change, like a wider opening or a moved doorway.
  • Rough plumbing, wiring and the duct for the range hood. Those are other trades, and the job needs them.
  • Insulation and air sealing on the outside walls, then drywall.
  • Flooring, or at least a subfloor made flat and solid.
  • Cabinets, then a template for the counters, then the counters themselves.
  • Sink, appliances, backsplash, trim and paint.

Skip around in that list and something gets done twice.

What turns up

Under an old kitchen floor there are usually more floors. Two or three layers of vinyl and plywood, each one laid over the last one's troubles. Around the sink and the dishwasher the subfloor has often been wet for years. In the walls there are studs notched for pipes that are long gone, wiring from several different decades, and now and then a vent that goes nowhere. None of it is a disaster. All of it has to be dealt with before a cabinet hangs on that wall, and I'd sooner tell you about it the day I find it than cover it up.

What to have ready

Know how you cook and how many people are in the room when you do. Pick the appliances early, down to the model numbers, because cabinets are built around them to a fraction of an inch. Work out where you'll make coffee and wash dishes while the kitchen is gone. And leave some room in the budget for the walls to have their say. They generally do.

Outside walls, cold, and the wait for cabinets

Up here the kitchen sink likes to sit under a window, and that puts water lines in an outside wall. In January that's asking for it. With the wall open, I want those pipes on the warm side of the insulation, or brought up through the floor inside the cabinet, and the wall behind them insulated and sealed tight. Vermont law presumes lead paint in any house built before 1978, and paid work that disturbs it falls under the state's RRPM rules, which the Department of Health runs. That changes how a tear-out gets done, so the age of the house is one of the first things I ask about. Cabinets can take a long while to arrive. Order them once the layout is settled, and don't tear anything out on a hopeful delivery date.

Worth knowing before you start

  • A range hood that vents outdoors beats one that blows the grease back into the room. Work out the duct route before the cabinets are ordered.
  • Counters get measured after the cabinets are set, so there's a stretch with cabinets and no countertop. Plan on it.
  • In Burlington a kitchen job goes through the city's own building permit and inspections. In other towns, start at the zoning office and ask what a kitchen remodel needs.
  • Ask any builder, me included, for a written contract that spells out the scope and the price.

Questions I get

Can I live in the house while the kitchen is torn out?

Most people do. It's dusty and inconvenient and you'll get tired of the microwave. Set up a corner with the fridge, a hot plate and a sink you can reach, and it's livable. In a house built before 1978 the dust control matters a good deal more, on account of lead.

Should I buy the cabinets before I call a builder?

I'd hold off. Cabinets ordered before anybody has measured the room and looked in the walls tend not to fit the room you end up with. Settle the layout, check the structure, then order.

Does the floor have to come up too?

Usually, at least to the subfloor. Old kitchen floors are stacked in layers and the bottom one is often the one that got wet. New cabinets and a stone counter want a flat, solid floor under them, and I can't promise that without seeing what's down there.

Where I build these

Burlington, South Burlington, Shelburne, Williston, Essex, Colchester, Milton, Jericho, Richmond, Waterbury, South Hero and Grand Isle. Each link goes to what kitchens means in that town.

Is this your project?

Tell me about the land or the house and what you're after. I look at it first, then the price and the scope go on paper.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.

This is used to answer you about your project and for nothing else. I’ll call or email you back.

Call Harold Write to me