A plaster wall in an old farmhouse tells you very little from the room side. It might be hiding a hand-hewn post, a hundred years of mouse traffic, or nothing at all where you expected a stud. In fifty years I've learned to expect something, and to find it before it gets expensive.
Here's what turns up, and what each thing means for a remodel.
Framing from before the lumberyard
The oldest houses around here are timber frames: big posts and beams, pegged together, with lighter pieces filling in between. The frame carries the house. The walls between the posts mostly don't, which can be good news if you want to move one and bad news if somebody already cut a post to fit a door.
Later houses are often balloon framed. The studs run from the sill clear to the roof with the second floor hung off them. Those stud bays are open from cellar to attic. Cold air runs up them, and so would a fire. When one of those walls is open, the bays get blocked at each floor before it's closed again.
Then there's what was done later. Joists notched halfway through for a drain line. A carrying wall taken out and a doubled 2x6 put up to do the job of a beam. A chimney with framing resting on it. None of it is unusual. All of it gets found, and it's better found on purpose.
Wiring from three different eras
An old house usually has some of everything: knob and tube from the first time it was wired, cloth-covered cable from the second, plastic cable from last year, and splices joining them in places no splice should be.
Wiring is an electrician's trade and the job needs one. My part is to stop when I open a wall and find old wire, and to make sure nobody packs insulation around it until an electrician has said what stays and what goes.
Insulation, or what passes for it
Sometimes the cavity is empty. Sometimes it's newspaper, sawdust, corncobs or brick. All of that is just history.
The one to stop for is vermiculite. It's a loose, pebbly fill, gray and gold, usually in attics and sometimes poured down into walls. The Vermont Department of Health says vermiculite insulation should always be treated as containing asbestos, and that there's no approved test to prove a given batch is clean. If I see it, the work stops in that area and it becomes a job for people licensed to handle it.
On the other side of the ledger, an open wall is the one cheap chance to insulate it. The state energy code doesn't make you tear into walls you weren't touching. But a cavity that gets exposed during the work is expected to be filled with insulation before it's closed. I'd do it whether the code said so or not.
Lead and asbestos
If the house was built before 1978, Vermont law presumes the paint has lead in it, and that includes old stain and sealer. Paid work that disturbs more than a small patch of it falls under the Health Department's lead-safe work rules.
Asbestos is broader than most people think. The Health Department's list includes pipe wrap, the paper and cement board around old furnaces, floor tile and the glue under it, joint compound, textured ceilings, and cement siding and roofing. The state says to assume it's there. Its guidance is that the owner has a Vermont-licensed asbestos inspector look at the building before renovation or demolition, and that anything found is removed by a licensed abatement contractor first. Call the Asbestos and Lead Regulatory Program at 802-863-7220 and ask what your particular job needs.
An old house is still worth owning. Find out what's in it before the saw comes out.
Water, the oldest problem
Most of the real damage I find was done by water, slowly. The usual places:
- The sill, especially at the corners and under doors.
- Under windows, where the old flashing gave up.
- Around the chimney.
- Behind and under a tub.
- Where a porch or shed roof meets the house wall.
Old houses got away with a lot because they leaked heat. A wet wall dried out again from the warmth going through it. Insulate that wall and it stays colder and dries slower, so a leak that was tolerable for eighty years starts doing harm. The state's own energy code handbook makes the same point. So the leak gets fixed before the insulation goes in.
How I go at it
I look at the house before I talk about the job. The cellar and the attic show a lot without breaking anything: the frame, the sills, the wiring, what's been cut. A small hole in the right place answers more than an hour of guessing.
Then the scope and the price go in writing, and the writing says plainly what's known and what isn't. When a wall comes open and something's there, I tell the owner what it is and what the choices are. An old house can be put right. It just can't be rushed into it.
Is this your project?
This is work I do. See remodeling & renovation for what it covers, or tell me about yours.