Whole-house renovation: one job, done in the right order

When a house needs most everything, it pays to do it as one job instead of six. Here's how I'd go at it.

When this is the right project

  • The house needs wiring, plumbing, insulation and finishes all at once, and each of those means opening the same walls.
  • You like the lot and the bones better than anything you could buy somewhere else.
  • You've been fixing a room a year and the list grows faster than you cross things off.
  • You just bought the place and nobody has moved in yet.

Most houses get fixed a room at a time. That works until the wiring, the plumbing and the insulation all need doing, because every one of them runs through the same walls. Open a wall three times and you've paid for it three times. A whole-house renovation opens things once, fixes what's in there, and closes them up for good.

What it takes in

The house comes apart down to some agreed point. Sometimes that's bare studs everywhere. Sometimes the plaster stays upstairs and only the kitchen, the baths and the back of the house get gutted. From there it's framing repairs, new wiring, new plumbing, heat, insulation, air sealing, drywall, then trim, floors, cabinets and paint. Windows, siding and roofing may or may not be part of it. Wiring, plumbing and heating belong to their own trades, and the job needs all of them.

The order matters more than the finishes

  • Structure and water first. Roof leaks, rotted sills, sagging floors, a wet cellar. Nothing pretty goes in over those.
  • Framing changes next: walls moved, openings cut, stairs fixed.
  • Then the rough work by the trades, while the walls are open.
  • Insulation and air sealing, and whatever inspections the town calls for.
  • Drywall, floors, trim, cabinets, paint. In that order.

People want to pick tile the first week. I understand it. But the money gets decided down cellar and up at the roof, and the tile comes out of whatever is left.

What the walls give up

I can tell a fair amount from a cellar, an attic and a flashlight. I can't see through plaster. Once it's open, expect some of this: a stud notched nearly in two for an old drain, a header that's one flat board, wiring from different eras spliced together, a bath fan blowing into the attic, rot under a window nobody knew leaked. None of it is strange. I'll show you what I find and put the fix in writing before I go ahead with it.

Decisions that are yours

Where you'll live is the big one. A gutted house has no kitchen, some weeks no bathroom, and dust the whole time. Living through it can be done, but it slows the work and wears on a family.

The other is how far to go. Taking the house to the studs costs more up front and makes for better wiring and a tighter house. Keeping the plaster saves the old look and limits what can be reached. No single answer suits every house, only yours.

Have this ready

A list of what bothers you about the house, in order. Any old plans and permits, the septic paperwork, and the inspection report from when you bought it. A number you can spend, with some of it held back for surprises. And some idea of what you'd give up first if the walls turn out worse than they look.

Old houses and the rules up here

Most houses in this part of Vermont that need the full treatment went up before 1978. The Vermont Department of Health's RRPM rules presume the paint in a house that age has lead in it unless a licensed inspector has tested it and found otherwise, and paid work that disturbs that paint has to follow the lead-safe rules. Ask any builder how that will be handled before a wall comes down. The state energy code, RBES, covers renovations too, for the parts of the house being worked on, and a certificate gets filled out at the end. Add a bedroom and the state wastewater permit comes into it. Zoning belongs to the town, and Burlington has its own building permits and inspections besides. Start at the town office.

Worth knowing before you start

  • Vermont registers residential contractors but doesn't license them. Whoever you hire, ask to see the registration number and the insurance certificate, and get the whole job on paper.
  • Hold some of the budget back. An old house always has an opinion about the plan.
  • Windows, cabinets and anything special should be ordered early. A house can sit open waiting on a truck.
  • Inside work goes fine in winter, as long as the roof and the outside are tight before the cold comes.

Questions I get

Can I live in the house while it's being renovated?

Sometimes. If the job can be split so one bathroom and a makeshift kitchen stay working, people do it. If the whole house is coming down to studs, or old paint is being disturbed and there are small children in the family, plan on being somewhere else. I'll tell you which kind of job yours is once I've walked through it.

Is it better to renovate or tear down and build new?

Depends on the foundation and the frame. If those are sound, the house is usually worth saving, and an old house may sit closer to the road or the water than the town would let a new one. If the foundation is failing and the frame is rotted, you're building a new house the hard way. Ask the town what a teardown would do to your permits before you decide.

Can you give me a firm price before the walls are open?

I can price what I can see and write down what I'm assuming about what I can't. When a wall opens and the assumption was wrong, you'll hear it from me before anything gets covered up, with the fix in writing.

Where I build these

Burlington, South Burlington, Shelburne, Williston, Essex, Colchester, Milton, Jericho, Richmond, Waterbury, South Hero and Grand Isle. Each link goes to what remodeling & renovation means in that town.

Is this your project?

Tell me about the land or the house and what you're after. I look at it first, then the price and the scope go on paper.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.

This is used to answer you about your project and for nothing else. I’ll call or email you back.

Call Harold Write to me