One bathroom for a whole family was normal when most of South Burlington was built. It was a five-by-eight room off the hall with a steel tub, a small vanity and a window in the shower wall where it could do the most harm. Half a century of showers later, the wall behind the tile is usually soft, and the family has been wanting a second bathroom for years.

I treat a bathroom as a wet room that happens to have nice tile. Everything behind the finish gets built to stay dry or to dry out: the framing repaired, a proper backer and waterproofing behind the tile, and a fan that moves real air to the outdoors. Do that and the finishes are a matter of taste. Skip it and the room gets rebuilt again in fifteen years.

South Burlington City Hall and library, a modern brick and glass building on Market Street
South Burlington City Hall on Market Street. Photo: SBVT Communications, CC0, via Wikimedia Commons. Resized.

What South Burlington houses and land call for

  • Rebuilding the original hall bath

    The old tub comes out, and that's when the truth shows. The subfloor at the tub and around the toilet is the usual casualty, along with the bottom of the wall where the window sat. Rot gets cut out and replaced, the window gets moved or changed to one that can take the water, and old galvanized or tired copper lines get replaced by a plumber while they're in the open. Then it goes back together as a room that could be hosed down.

  • A second bath upstairs in a cape

    The upstairs of a cape has two bedrooms under the slopes and no plumbing. A bathroom fits best under a dormer, new or existing, set over the kitchen or the downstairs bath so the drain has a short, straight trip to the stack. Headroom over the tub and in front of the toilet is what the layout turns on. The floor joists up there were sized for bedrooms and may need help before they hold a tub.

  • A first-floor bath built for staying put

    A ranch is a good house to grow old in, with everything on one floor, and the bathroom is where that gets decided. That means a shower with no curb to step over, a doorway wide enough for a walker, solid blocking in the walls for grab bars now or later, and a floor that isn't slick when wet. Building these in during a remodel adds little. Adding them after a fall is a rush job.

Before 1978: lead paint, and what's under the floor

A big part of South Burlington's housing went up before 1978, and that date matters. Vermont's lead rules, known as RRPM and run by the Vermont Department of Health, cover paid work that disturbs paint in housing built before then, and a bathroom gut disturbs plenty. The same houses often have layers of old sheet flooring and tile under the current floor, and some of that material and its glue contains asbestos. It gets tested before it gets scraped. Neither one should stop a bathroom job. Just ask whoever does the work, me included, how each will be handled, and see that it's written into the contract.

The projects, by name

Each one has a page of its own that says when it fits, how it goes together and what to settle first.

Or read the whole bathrooms page.

Bathrooms in South Burlington: questions

Can a bathroom go in the basement?

Yes, if the basement is dry. On South Burlington clay that's a real if, so the water question gets answered first. The drain is the next one. Where the house sewer leaves through the wall above the floor, basement fixtures need a pump to lift waste up to it. The floor has to be cut for the drains, and the walls built so they don't trap damp against the concrete. It's a good use of space when the conditions are right.

A project in South Burlington?

Tell me where it is and what you want. I come look at the land or the house, and the price and the scope go in writing.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project