Gutting a bathroom and building it back to stay dry

A bathroom is a small room that sees more water than the rest of the house put together. A full remodel is the chance to build it so the water goes where it's supposed to.

When this is the right project

  • Tile is loose or cracked, and the grout won't come clean anymore.
  • There's a stain on the ceiling under the bathroom.
  • The fan is loud, weak or missing, and the paint keeps peeling.
  • The door hits the toilet, or the room is laid out around a tub nobody uses.
  • The valves and fixtures are old enough that parts are hard to find.

Everything you can see in a bathroom depends on something you can't. The tile is only as good as what's behind it, and the floor is only as good as what's under the toilet. So a full remodel takes the room down to the studs and the subfloor. Anything less and you're guessing.

Decide these before the tear-out

Layout comes before finishes. The toilet is the hard fixture to move, since its drain is the biggest pipe in the room and has to slope the whole way to the stack. Leave the toilet where it is and the job stays simpler. Move it and the floor framing decides how far it can go.

Waterproofing comes before tile. Tile and grout shed most of the water and let the rest through. What keeps the framing dry is the membrane behind the tile, and that has to be picked and planned before a single tile gets bought.

Ventilation gets a real plan. A fan sized for the room, ducted outdoors, on a timer so it keeps running after you've left.

Fixtures get chosen early. A shower valve goes inside the wall, and the wall gets built around that exact valve.

The order the work goes in

  • Tear out to the studs and the subfloor.
  • Repair framing and subfloor, and stiffen the floor if tile is going down.
  • Put blocking in the walls for the vanity, the glass and any grab bars.
  • Rough plumbing, wiring and the fan duct, every bit of it work for other trades.
  • Insulate the outside walls.
  • Backer board and waterproofing in the wet areas, drywall everywhere else.
  • Flood test the shower pan if there is one.
  • Tile, then paint.
  • Vanity, toilet, fixtures and trim.

What turns up

The floor around the toilet is the usual suspect. A seal that's leaked a little for years leaves the subfloor black and soft. Under and behind the tub there's often no insulation at all on an outside wall, and sometimes plain drywall behind the old tile, gone to mush. Joists have a way of getting notched deep by whoever ran the pipes the first time. Old galvanized supply lines and cast iron drains may be near the end. And every so often the old fan turns out to blow straight into the attic, which explains the stains up there.

I'll show you what I find when it's open. Most of it is ordinary and gets fixed with some carpentry. Some of it changes the plan, and you ought to hear that from me right then.

What to have ready

Have your fixtures picked: tub or shower base, valve, vanity, toilet. Figure out where everybody showers in the meantime. If it's the only bathroom in the house, say so the first time you call, because that changes how the whole job gets planned.

Winter moisture and pipes on the cold side

A Vermont house is shut up tight for most of the winter, and a shower puts a lot of water into the air. If the fan doesn't carry it outdoors, it ends up as frost in the attic or mold behind the paint. I want the fan ducted through the roof or a wall, in insulated duct, never left blowing into the attic or the soffit. A tub or shower valve on an outside wall is the other trouble. A valve in a cold wall can freeze, and there's no good way to insulate behind it. If the layout lets the plumbing move to an inside wall, that's worth doing. In a house built before 1978, tearing out painted plaster and trim is covered by Vermont's RRPM lead rules, which the Department of Health runs. A bathroom gut in Burlington goes through the city's own building permit office, and South Burlington asks for a zoning permit on inside work past a certain cost. Other towns each have their own answer, so ask.

Worth knowing before you start

  • Blocking in the walls for grab bars costs next to nothing while the studs are showing, even if you never hang a bar.
  • A fan on a timer or a humidity control runs long enough to dry the room, and nobody has to remember it.
  • Tile wants a stiff floor. A floor that bounces will crack tile and grout no matter how well they're laid.
  • A heated floor or a towel warmer is wiring that goes in before the tile. Decide early.

Questions I get

Can the toilet be moved to a different wall?

Often, but it's the move that costs the most work. The drain has to keep its slope and get to the stack without cutting the strength out of the joists. If the joists run the right way it's reasonable. If they run the wrong way, a different layout usually beats forcing it.

Do the walls really have to come down to the studs?

In the wet areas, yes. You can't waterproof over old tile and whatever is behind it and know what you've got. On the dry walls sound plaster or drywall can sometimes stay, though new pipes and wires usually end up opening those too.

Where I build these

Burlington, South Burlington, Shelburne, Williston, Essex, Colchester, Milton, Jericho, Richmond, Waterbury, South Hero and Grand Isle. Each link goes to what bathrooms means in that town.

Is this your project?

Tell me about the land or the house and what you're after. I look at it first, then the price and the scope go on paper.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.