A deck leads a harder life than any other part of a house. It's flat, it's outdoors, it holds snow for four months, and it's bolted to the one wall you most want to keep dry. The ones that last and the ones that go spongy early are built from the same lumber. What separates them is a handful of details, most of them out of sight.
The ledger
The ledger is the board that fastens the deck to the house, and it's where I look first on any old deck. Water runs down the siding, gets behind the ledger, and sits there against the house framing. The deck looks fine from on top while the rim of the house rots behind it.
Doing it right takes a little more time and no special materials:
- The siding comes off where the ledger goes. A ledger never gets fastened over clapboards or shingles.
- The wall behind gets a waterproof membrane lapped under the housewrap above.
- The ledger is bolted or fastened with structural screws into solid framing. Nails alone don't count.
- Metal flashing goes over the top of the ledger, tucked up behind the siding and the housewrap and kicked out over the face, so water running down the wall lands on the flashing and leaves.
- The door above gets a pan under its sill. A leaking door threshold rots more ledgers than rain does.
There are places a ledger shouldn't go at all: on a brick veneer, on a floor that cantilevers out past the foundation, or on an old rim that's already soft. Then the deck gets its own row of posts next to the house and stands by itself. A freestanding deck puts no holes in the wall, and on an old house I often like it better.
Footings
A deck is light, and that works against it. Frost can lift a deck post easily, and it doesn't set it back down in the same place.
Footings go below frost depth, and they need a wide enough base for the soil they're on. In clay, frozen ground also grips the sides of a pier and jacks it upward, so the pier should be smooth-sided and bigger at the bottom than the top. The depth for your site is a question for the town or the inspector.
Keep the wood out of the dirt. Posts sit on metal bases on top of the concrete, held up off it a little, where the end grain can dry. A post buried in concrete is standing in a cup of water.
A porch with a roof is a bigger matter than a deck. Those footings carry the roof and the snow on it, and they get sized for that.
Wood, fasteners and water
Posts and anything near the ground should be pressure-treated lumber rated for ground contact. The preservative is hard on plain steel, so hangers, bolts and screws have to be hot-dip galvanized or stainless.
Then it's a matter of not trapping water.
- Gaps between deck boards, so water and needles fall through.
- Tape or a cap on top of the joists, where the screw holes let water into the wood.
- Cut ends sealed.
- Room under the deck for air to move. A deck a foot off the ground with skirting all the way around stays damp all summer.
Porch roofs and where they meet the house
A porch roof ties into the house in one of two ways, and each has a weak point.
When it lands against a wall, the joint needs flashing that runs up behind the siding, and the siding is held up off the roofing so it isn't sitting in water. When it joins the main roof, there's a valley or a change in pitch, and that's where snow piles up and ice forms.
Porch roofs tend to be low-pitched and unheated, tucked under a bigger roof that sheds onto them. Snow slides off the main roof and lands on the porch. Meltwater from the warm roof runs onto the cold one and freezes at the eave. So a porch roof wants a waterproof membrane under the roofing from the eave well up the slope, and framing sized for more snow than its own share.
Rails and stairs
Vermont's fire safety code sheet on guards, the same one Burlington posts on its permitting pages, calls for a guard wherever a walking surface is more than 30 inches above the ground, with openings tight enough that a 4-inch ball can't pass through. Whether or not anybody is coming to inspect, that's the standard I'd build to. Ask the town which numbers apply to a house.
The rail posts are the part people get wrong. A post that's just screwed to the outside of the rim will pass a shake test the day it's built and fail it a few winters later. Posts get bolted and blocked so the load goes into the frame.
Permits
Decks need permits in more places than people expect. Burlington's ordinance lists porches, patios and decks among the work that takes a zoning permit. South Burlington says all new decks need a zoning permit regardless of size, and that screening in a deck or porch, or making it a three-season room, takes a permit too. Towns commonly count a deck toward lot coverage and hold it to the setbacks, so ask about both.
Near the lake there's one more. Under the state's Shoreland Protection Act, rebuilding a deck in exactly the same footprint within 250 feet of the water is exempt. Building a bigger one in that strip may need a state permit or registration. In Burlington and Colchester the town handles it.
Call the zoning office with a sketch and the distance to each lot line before any lumber gets ordered.
Is this your project?
This is work I do. See porches & decks for what it covers, or tell me about yours.