Concrete will carry a loaded truck for fifty years and then crack in half because the ground under one corner moved an inch. Nearly everything that goes wrong with a garage or barn floor goes wrong underneath it, before the truck ever shows up. So that's where the thinking belongs.
What frost does
Frost heave takes three things: cold, water, and soil that holds water. Take away any one and the ground stays put. Nobody can do much about the cold in northern Vermont. The work is all in the other two.
Clay and silt are the soils that heave. They hold water and wick more of it up from below as they freeze, and the ice grows in layers and lifts whatever is on top. There's a lot of clay in the Champlain Valley and on the Islands.
Heave isn't even, and that's the trouble. The sunny side thaws while the north side is still frozen. The edge by the downspout heaves more than the middle. A slab can ride up and down as one piece and survive. It can't survive being lifted at one corner.
What goes under the slab
Topsoil and anything with roots in it comes out, down to firm ground. Then clean gravel or crushed stone goes in, in layers, each one compacted before the next. How much depends on what's under it. On good draining ground a modest base will do. On wet clay it takes a good deal more, and often a drain to give the water somewhere to go.
Stone under a slab does a second job. Water can't climb through coarse stone the way it climbs through fine soil, so a stone layer stops the ground from wicking moisture up into the concrete. The state's energy code handbook describes the same thing in its chapter on moisture.
Three ways to hold up the building
An attached garage gets the same foundation as the house: a wall on a footing set below frost. If the garage moves and the house doesn't, the joint between them opens up.
A detached garage or a barn has choices.
- A frost wall with the slab poured inside it. The building stands on the wall, and the slab is free to move a little by itself. This is the one I trust most on bad ground.
- A slab with a thickened edge, poured in one piece on a deep, well-drained gravel pad. The whole thing floats together. On gravel soils it does fine. On wet clay I'd want an engineer's opinion first.
- A post-frame barn, where posts set below frost carry the roof and the floor is poured afterward, or left as gravel.
Below frost, in this part of the state, is counted in feet. I won't put a number here, because the town, the inspector or the engineer sets it for your site, and soil and snow cover both figure in. Ask before the excavator comes.
Drainage is most of it
Pick the high ground. A garage set in the low spot on the lot is a pond with a roof.
The finished floor should sit above the ground around it, and the ground should fall away on all sides. Uphill of the building, a swale turns the runoff before it reaches the wall. Roof water needs its own plan. A metal roof sheds its whole snow load along the eaves, where it sits against the building and melts there in March. Give that water a stone trench or a gutter and a way out.
Inside, cars bring in snow and it melts. A garage floor should slope toward the door so the melt runs out under it. Floor drains are another matter. A drain has to empty somewhere, and where it empties can be the state's business. Ask the state's permit people before you plan one.
The apron in front of the door heaves more than anything else on the place, because it's outdoors, unheated and usually wet. Give it the same base as the building and a joint where it meets the slab.
The concrete itself
Concrete shrinks as it cures, and it will crack. Control joints tell it where. They get cut or tooled in a grid soon after the pour, so the crack follows the joint and nobody ever notices it.
Thickness and steel depend on what's going to sit on the floor. A couple of cars is one thing. A tractor, a loaded trailer or a lift with posts bearing on small pads is another, and the slab gets thickened where those loads land.
Heat, now or someday
If there's any chance the building gets heated, even a corner of it for a shop, put the insulation under the slab and around its edge now. You can add insulation to walls any year you like. You get one chance at the floor.
The state energy code has slab insulation requirements for heated space in houses, including the slab edge. Whether your particular shop or garage falls under it is a question for the Energy Code Assistance Center at 855-887-0673. Either way, a warm slab with a bare edge bleeds heat into the ground all winter.
Before you dig
A new garage or outbuilding needs a zoning permit in any town with zoning, and the town sets how close to the lot line it can go and how tall it can be. Burlington's list of what needs a permit names garages, sheds, accessory buildings and new or expanded driveways. South Burlington says every shed needs one, whatever the size. Working farm buildings are treated differently under state law, so if it's a real farm barn, ask the town how that works.
If the building will have a sink, a toilet or living space upstairs, talk to the state's wastewater office first. Plumbing in an outbuilding can call for a permit of its own.