A roof in this country has two jobs that pull against each other. It has to hold a winter's worth of snow, and it has to get rid of water the minute that snow starts to melt. Most of the roof trouble I've seen in fifty years comes from doing the first job and forgetting the second.
How an ice dam gets made
The Department of Energy's building guidance lays it out simply. Heat leaking up from the house warms the roof deck. Snow lying on the deck melts from underneath. The water runs down to the eave, which hangs out past the wall and stays cold, and there it freezes. Ice builds into a ridge. More meltwater backs up behind the ridge, gets under the roofing, and comes into the house.
Snow makes it worse by being decent insulation. A deep blanket of it holds the house's heat against the deck.
So an ice dam is a heat leak you can see from the yard. The shingles rarely have anything to do with it.
Designing them out
The same guidance gives three priorities and puts them in order.
First, seal the ceiling so warm air can't get into the attic. It calls this the most important step. Every light fixture, pipe, wire hole, attic hatch and wall top plate is a leak until somebody closes it.
Second, insulate the attic heavily, all the way out to the edges. The edge is where houses cheat. An ordinary truss pinches down to almost nothing over the outside wall, so the insulation is thinnest right above the spot where ice forms. A raised-heel truss lifts the roof enough to carry full depth out over the wall plate. Vermont's energy code handbook shows that detail and says heat loss at the roof-to-wall junction can contribute to ice dams.
Third, ventilate under the roof deck. Air in at the soffit and out at the ridge, through every rafter bay, with baffles holding the insulation back so the channel stays open. The federal guidance recommends at least two inches of clear space there. The handbook's reasoning is that a deck kept cold in winter is less likely to dam, and the same air path gives the roof a way to dry.
And keep heat sources out of the attic altogether. Vermont's 2024 energy standard requires ducts and air handlers to be inside the conditioned part of the house, which settles that argument.
Pitch and shape
Simple roofs behave. A plain gable sheds snow and water off two sides and has no place for either to collect.
Every valley, dormer and skylight is a spot where snow gathers and meltwater concentrates. A low-pitched roof tucked under a taller wall catches whatever slides off above and whatever drifts against the wall. All of those can be built and made to work. Each has to be detailed with more care, and each is a place to look first when a stain shows up on a ceiling.
Steeper roofs shed sooner, and metal sheds sooner than shingles. That's good for the roof and worth thinking about on the ground, because whatever comes off lands somewhere. Not over the main door. Not on the deck. Not on a heat pump's outdoor unit or the gas meter. Put the door under a gable end, or give it a small roof of its own.
Overhangs
I like a generous overhang. It keeps rain off the siding and the windows and away from the foundation. But the overhang is the cold part of the roof, where ice wants to form, and the federal guidance cautions against large ones unless the venting is designed for them. It also says to place soffit vents out toward the fascia edge. So a deep overhang wants a continuous vent at its outer edge and a clear air path behind it.
Under the roofing
Self-adhering membrane goes on the deck at the eaves, in the valleys, and around chimneys, dormers and anything else that comes through the roof. The guidance treats it as standard practice in ice dam country and suggests covering the entire deck in severe, high-snow areas. It won't stop a dam from forming. It keeps the water out of the house when one does, which is what a second line of defense is for.
Cathedral ceilings
People want them, and they can be built right. But the handbook is candid that unvented roofs carry more moisture risk, both from ice damming and from having less ability to dry. If the ceiling is going to follow the roof, I'd sooner vent it, or put a vented layer over the top, than pack the rafters full and hope.
Snow load
Holding the snow up is structure, and structure is designed to a snow load for the site. That figure changes with where the house is and how high up it sits, and drifting adds to it wherever a low roof meets a taller wall. I won't give a number here. Ask the truss supplier or the engineer what load the roof was designed for, and get it on paper. Where a town reviews building work, as Burlington does under the state's adopted codes, the inspector will want to see it too.
Reading the roof you have
Icicles are a heating bill hanging off the eave. Bare patches on a snowy roof show where the heat is getting out. Heat cable treats the symptom. The cure is up in the attic with a foam gun and a lot more insulation.
Is this your project?
This is work I do. See new homes for what it covers, or tell me about yours.