People ask me whether to add on or sell while they're standing in a kitchen that's too small. I can't answer it from the kitchen. The answer is out in the yard, down at the septic tank, and on a counter at the town office. Here's how I work through it.
What the lot will allow
Every town draws its own lines: how close to the boundary you can build, how much of the lot can be covered, how tall. A house that already sits tight to a side line may have no legal room to grow in the direction you had in mind. That's a five-minute question for the zoning administrator, and it costs nothing to ask.
Burlington is a fair example of how a town thinks. Its ordinance lists additions to existing buildings, increased lot coverage and added living space among the things that need a zoning permit. Smaller towns write it shorter, but I don't know a town around here where an addition goes up without one.
If the house is near the lake, there's a second layer. The state's Shoreland Protection Act covers development within 250 feet of the mean water level on lakes bigger than 10 acres. Expanding a house inside that strip can take a state permit or registration. Burlington and Colchester handle shoreland permitting themselves, so there you start with the town.
What the septic will allow
This one surprises people. In Vermont a septic system is sized by bedrooms. Add a bedroom to a house on its own system and you've raised what the state calls the design flow. That takes a wastewater permit from the Department of Environmental Conservation, with a licensed designer doing the design.
Sometimes the system in the ground already has the capacity. Sometimes it has to be enlarged, and then the lot needs room and decent soil for it. Sometimes there's no room at all, and the addition you can build is a family room or a bigger kitchen, with no new bedroom in it.
Houses on town sewer have an easier road, though not always a free one. Ask before you assume.
What the old house will carry
An addition leans on the house it's attached to, and some houses are better to lean on than others. Things I look at before I'd tell anybody to add on:
- The foundation where the new work ties in. Cracked, bowed or wet, it gets fixed first.
- The roof. A new roof has to meet the old one somewhere, and that joint has to shed water and snow for decades.
- The heating system and the electrical service. Those are other trades, and somebody who does that work has to say whether what's there can carry more house.
- The floor levels. Old floors are rarely level, and the new floor has to meet them without a trip step.
The state energy code applies to additions too. The new part has to meet the standard even if the old part never did. That's no hardship. The addition will likely be the warmest room in the house, and you'll notice it at the doorway.
Going up instead of out saves the yard and dodges the lot coverage problem. It also means the first floor walls and the foundation carry a load they weren't built for, and you're living under an open roof for a while. An engineer has to look at that before anybody commits to it.
When I'd tell you to move
I build additions, so take this as coming from a man arguing against his own work. There are times moving is the right call.
When the lot has no room and the septic has no room, you're done before you start. When the house needs a foundation, a roof and wiring before the addition even begins, you're paying for a new house and getting an old one with a wing on it. And when the trouble is the road, the school or the commute, no amount of carpentry fixes where a house sits.
On the other side of it, the house you own has no secrets left. You know where the water goes in April and which rooms get the sun. The next house will have its own surprises, and you'll be finding them while you make the payments.
What to do first
Do these in order, before anybody draws anything.
- Call the town zoning office with your address and ask what the lot allows.
- Find your septic permit. The state has a permit search, and the regional office can help if you can't turn it up. For most of Chittenden County and the Islands that office is in Essex Junction.
- Have a builder walk the house and the land. I look at both before I say a word about what's possible.
- Get the scope and the price in writing before anything gets ordered.
Then decide. A week of phone calls up front beats finding out in the middle of framing.
Is this your project?
This is work I do. See additions for what it covers, or tell me about yours.