Living Through a Remodel: What to Plan For

Dust travels, the kitchen disappears, and the house has opinions of its own. How to stay put through a remodel, and when you shouldn't.

Additions and remodeling · 4 minute read

Dust travels. That's the first thing to know about staying in a house while it's being worked on. It goes under doors, up the stairs and into the kitchen cupboards. Plan on that and the rest gets easier.

Plenty of people stay put through a remodel and come out fine. A few should move out and don't. Here's how I'd sort it.

Decide what you can do without

Go room by room and ask what happens when it's gone.

A kitchen is the hard one. You can live a good while on a microwave, a toaster oven and a utility sink if they're set up in another room before the old kitchen comes out. Washing dishes in a bathtub gets old inside a week.

A bathroom depends on how many you have. If the house has one, the job has to be laid out around that fact, and you should hear how before work starts.

Heat matters more here than most places. If the work touches the heating system or opens an outside wall, the season you pick is part of the plan. I'd rather open a wall in June than in January, and so would you.

The dust that matters

Most construction dust is a nuisance. Some of it is a hazard, and Vermont has rules about that kind.

If the house was built before 1978, state law assumes there's lead in the paint. A contractor who disturbs more than a square foot of painted surface in a room has to be licensed for lead-safe work by the Health Department and has to follow its practices. For somebody living in the house, those practices are worth knowing, because you can watch for them:

  • Plastic over the floors and over furniture that can't be moved, taped down.
  • The doorways and heat registers of the work area closed off with plastic.
  • Painted surfaces misted before anybody scrapes or cuts them.
  • The mess picked up and the work area shut every day before the crew leaves.
  • At the end, a HEPA vacuum over everything, then wet wiping and wet mopping.

The licensed firm also has to hand you two pieces of reading before the job starts. If nobody does, ask why.

Lead is hardest on young children and on anyone who's pregnant. If that's your household and the job is a dusty one, that's a strong reason to be somewhere else while the demolition happens.

Asbestos is the other one. The Health Department says to assume it's in the house, in things like old floor tile, pipe wrap, joint compound and textured ceilings. Left alone it does no harm. Broken up, it's a problem. That gets checked before demolition, by someone licensed to check.

Put the plan on paper

Vermont requires a registered contractor to have a written contract before starting a residential job at the $10,000 level or higher. I'd want one on a smaller job too. The price and the scope belong on paper, and so do the things that make living there bearable. Ask any builder these before you sign:

  • What hours will people be in the house, and on which days.
  • Which door the crew uses and where tools and materials sit overnight.
  • Where the dumpster goes, and for how long.
  • When the water or power will be off, and how much warning you get.
  • How changes get priced and approved.

That last one saves more arguments than the rest put together. Burlington's permitting office tells homeowners to put every change order in writing. That's good advice in any town.

What's behind the wall

No one knows what's in a wall until it's open. Old wiring, a notched joist, a pipe that's been dripping for years. When I open a wall, I tell the owner what I found, what it means, and what it changes.

You can make that easier on yourself by not spending the last dollar on the plan. Leave room for the house to have its say. Old houses nearly always do.

When to move out

I'd leave for the worst of it if:

  • The whole house is being gutted, or the only bathroom will be gone for more than a few days.
  • The heat will be off in cold weather.
  • There's lead work and small children in the house.
  • Somebody in the house has breathing trouble.
  • You work from home and need quiet. There won't be any.

Moving out for the demolition and rough work and coming back for the finish work is a fair middle road. The loudest and dirtiest part of most jobs is the front end.

Pets, kids and the neighbors

Doors get propped open on a job. A dog that bolts or a cat that hides in an open wall cavity is a real thing, so make a plan for the animals. Kids want to see everything, and a job site has nails, cords and holes in the floor. Set a rule about the work area and keep it.

Tell the neighbors before the dumpster arrives. People put up with a lot more noise when they heard about it from you first.

Is this your project?

This is work I do. See remodeling & renovation for what it covers, or tell me about yours.

Thinking about building?

A guide can't see your lot or your house. Tell me where it is and what you want, and I'll come have a look.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.

This is used to answer you about your project and for nothing else. I’ll call or email you back.

Call Harold Write to me