Finishing a basement, starting with the water

A basement is the cheapest square footage in the house, if it's dry. If it isn't, you're building a room for mold.

When this is the right project

  • The basement is poured concrete or block, with decent headroom.
  • It has stayed dry through a few springs, or you know exactly why it didn't.
  • You need a family room, an office or a shop more than another bedroom.
  • The house can't grow outward because of setbacks, septic or money.

Tape a square of plastic to the basement floor and another to the wall, and leave them a few days. If there's moisture under the plastic when you peel it, the concrete is passing water, and anything built against it will be damp. It's a cheap test and it tells a lot.

Dry comes before everything

Basement water comes in a few forms. Liquid water through a crack or over the footing in spring. Vapor through the concrete all year. Summer air condensing on cool walls. Each has its own fix, and paint is none of them. Gutters, grading and downspouts that carry roof water away from the house cure more wet basements than anything done inside. After that come drains, a sump, crack repair. Finishing waits until the basement has gone through a spring thaw dry.

Walls and floor

Wood and fiberglass against concrete is how basements get that smell. I want rigid foam against the concrete with the seams sealed, then the stud wall inside of that, and a bottom plate that's treated or held up off the slab. Same thinking on the floor: something between the slab and the finished floor that doesn't mind damp. No carpet glued to concrete. Nothing down low that wicks water, if I can help it.

The order

  • Test for moisture and radon. Fix both.
  • Move or box in what's in the way: beams, ducts, pipes. Keep access to shutoffs, cleanouts and the panel.
  • Frame, then wiring, plumbing and heat by those trades.
  • Insulate, close up, finish.

Things to decide early

Whether it's a bedroom. A bedroom needs a way out besides the stairs, which usually means cutting the foundation for a bigger window with a well outside it. It also counts toward the bedroom number on the wastewater permit. A family room has neither problem.

Whether there's a bathroom. Drains that sit below the sewer or septic line need a pump, and that's a plumber's design.

How much ceiling you can stand to lose. Every duct and beam hangs below the joists, and the ceiling either drops to clear them or steps around them.

What turns up

Behind old paneling: mold, white mineral crust, a crack somebody knew about. Under old floor tile: tile or adhesive that may hold asbestos, which gets tested and handled by people set up for it. At the top of the wall, around the rim of the floor framing: no insulation at all. That's one of the leakiest spots in a house and easy to fix while it's open.

Have ready

A year of notes on when and where it's been wet. A radon test result. The septic permit, to see the bedroom count. And what the room is for, because a workshop and a guest room get built differently.

Wet springs and radon

Basements up here get it from two directions. Snowmelt and spring rain raise the water table, and a good deal of the Champlain Valley is heavy clay that holds water against a foundation instead of letting it drain. Then July comes, humid air meets a wall that's still cool, and the wall sweats. Radon is the other thing. The Vermont Department of Health says one in seven Vermont homes has elevated radon and recommends that everyone test. Test before finishing the space, since people will be spending hours down there and a mitigation pipe is easier to run with the walls open. A fieldstone cellar is a different animal. I'll tighten one up and make it decent dry storage, but I won't tell you it ought to be a bedroom.

Worth knowing before you start

  • A dehumidifier is a helper. It won't make up for water coming through the wall.
  • Somebody will need to reach the sump, the shutoffs and the cleanouts someday. Leave them a door.
  • If the furnace or boiler is down there, it needs air and clearance. The heating contractor has the say on that.
  • Don't finish over a crack you haven't figured out.

Questions I get

The basement only gets wet once every few years. Can it be finished?

It can, once you find out why it gets wet and fix that. Once every few years is enough to ruin a finished floor and the bottom of every wall. Often the cause is a downspout or the grade on one side of the house. Sometimes it's the water table, and then the basement needs a drain and a sump before it needs a carpenter.

Does finishing a basement need a permit?

Ask the town. Many want a zoning permit for added finished space, and Burlington has its own building permit and inspections. Adding a bedroom brings in the state wastewater rules. The state energy code applies to the walls being insulated, too.

What if the radon test comes back high?

Then it gets fixed before the room gets built. The usual fix is a pipe from under the slab to above the roof with a fan on it, put in by a radon mitigation contractor. It's a known problem with a known cure, and far easier before the walls and ceiling are closed.

Where I build these

Burlington, South Burlington, Shelburne, Williston, Essex, Colchester, Milton, Jericho, Richmond, Waterbury, South Hero and Grand Isle. Each link goes to what remodeling & renovation means in that town.

Is this your project?

Tell me about the land or the house and what you're after. I look at it first, then the price and the scope go on paper.

(802) 992-8119

Call or text. If I don’t pick up, leave a message and I’ll call you back.

Tell me about the project

A new house, an addition or an old one that needs work. Say what you have and what you want.

This is used to answer you about your project and for nothing else. I’ll call or email you back.

Call Harold Write to me